Municipal Waste Incineration Power Generation Plant for Sale

Product Details
Customization: Available
Output Type: AC Three Phase
Gas Source: Gas
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Type of Ownership
State-owned
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
  • Municipal Waste Incineration Power Generation Plant for Sale
  • Municipal Waste Incineration Power Generation Plant for Sale
  • Municipal Waste Incineration Power Generation Plant for Sale
  • Municipal Waste Incineration Power Generation Plant for Sale
  • Municipal Waste Incineration Power Generation Plant for Sale
  • Municipal Waste Incineration Power Generation Plant for Sale
Find Similar Products

Basic Info.

Model NO.
300GF-3000GF
Certification
CE, ISO
Power
>200kW
Standard
Nonstandard
Model
300-1000gfm
Rated Power
300kw-1000kw
Fuel Type
Coal
Speed
500rpm/600rpm/750rpm
Structure
Inline 4 Stroke
Cooling Type
Open
Connection
3p4w
Warranty
One Year or 1500 Hours
Certificate
CE ISO
Intake
Natural/Turbocharger
Application
Power Plant, Factory Power Supply
Installation Abroad
Guide Installation
Transport Package
Plywood Package by Seaway
Specification
300kw-1000kw
Trademark
zichai
Origin
Zibo, Shandong
HS Code
850220
Production Capacity
500

Product Description

Municipal Waste Incineration Power Generation Plant for Sale

The basic principle of coal gasification system is to convert coal into combustible gas. It is then used as fuel in gas engine to generate electricity. Coal gasification system is characteristic of small land requirement and environment friendly.

Our coal gasification process includes three steps. The First step is coal gasification, which convert coal into syngas. The Second step is syngas purification. The producer gas coming from gasifier usually contains contaminants including dust, coke, tar and etc. The contaminants will be removed by the purification system to ensure normal operation of gas engine. The Third step is power generating in gas engine. The high temperature exhaust gas may be reused by waste heat boiler to generate steam or hot water for civil or industrial use). Steam turbine may also be considered to make a gas-steam combined cycle power plant, which will increase the total efficiency.


Municipal Waste Incineration Power Generation Plant for Sale

This technology uses thermochemistry conversion method. With company independent R&D technology, coal can be converted into electricity, heating or charcoal. Moreover, the coal can be turned into wealth and can be made full use of.

The basic principle of coal gasification power generation system is to convert the different types coal into gas, and use the combustible gas to drive gas generating equipment for electricity. It can take full advantage of the equipment's compact-design and environmental-friendly features. Therefore, it is one of the most eco-friendly way for coal.

The process of coal gasification power generation includes three steps. The first step is coal gasification. The coal is converted into combustible gas. The second step is gas purification. The gas has impurities through gasification, including ash, tar, which should be removed with purification system in order to ensure the operation of gas power generator. The third step is gas power generation, which use gas engines(spark plug ignition type) for electricity generation, and the high temperature flue gas produced by the gas engine can heat boiler to get steam or hot water for residential or industrial use.

The coal gasification power generation system adopts modular design, which can be normally applied to power stations of 50-20000KW.


Typical coal quality index for gasifier
Item Technical requirements Test method
Particle size, mm bituminous coal:25~50,50~100,25~80 GB/T189
Block coal limit rate,% ≤18.0 MT/T1
Inclusion rate, % ≤3.0 MT/T1
Ash Ad, % ≤18.00 GB/T 212
Coal ash melting softening temperature ST (°C) >1250 GB/T 219
Total sulfur Std, % ≤1.00 GB/T 214
Thermal stability TS-6,% >60.0 GB/T 1573
Crush strength SS,% >60.0 GB/T15459
Maximum thickness of the gel layer (1) Y, mm ≤12.0 GB/T 479
Calorific value Qnet.ar, MJ/kg bituminous coal:>21.00 GB/T 213

Coal gasifier station
Municipal Waste Incineration Power Generation Plant for Sale

Gas Quality
  • Gas temperature≤40ºC
  • Gas pressure 2.5~10kPa
  • Pressure change rate≤1kPa/min
  • Calorific value ≥ 4.0MJ/Nm3
  • Moisture content≤40g/Nm3, no free water
  • Impurity content≤30mg/Nm3
  • Impurity size≤5μm
  • Tar content≤50mg/Nm3
  • H2S≤50mg/Nm3
  • Total sulfur≤100mg/Nm3
  • NH3≤20mg/Nm3
  • Cl≤50mg/Nm3
  • H2≤50%
  • O2≤1%
Municipal Waste Incineration Power Generation Plant for Sale
Municipal Waste Incineration Power Generation Plant for Sale
Gas Generator Specification
  Item Technical specification
Engine Model 6300D/M 6300D/M-1 8300D/M-1 8300D/M-2 8300D/M-3
Type Inline, water cooled, four stroke, spark plug ignition
Non-turbocharged
Cylinder number 6 8
Cylinder diameter (mm) 300
Rated speed(r/min) 500 600 500 600 600
Rated power (kW) 400 440 500 550 660
Rated thermal consumption(MJ/kW·h) ≤11.0
Rotate direction (From flywheel) Clockwise
Start mode Compressed air/motor start
Exhaust temperature (ºC) ≤600
Oil consumption(g/kW·h) ≤0.8
Generator set Type 350GFM 400GFM   450GFM 500GFM 600GFM
Rated power(kW) 350 400 450 500 600
Frequency(HZ) 50
Voltage(V) 400/6300/10500
Current(A) 631/40/24 722/46/28 812/52/31 902/57/34 1083/69/41
Power factor (COSΦ) 0.8 (Lagging)
Phase and connecting 3phases 4wires /3phases 3wires
Dimension (L×W×H) (mm) 5800×1600×2900 6400×1600×2900
Weight(kg) 18000 22000

Why Chosse Zichai product?
1. Development and manufacturing internal combustion engine since 1970
2. Factory area over 330000m2 & over 2200 employees
3. Highly versatile power generator with ability to handle more than 20 different gases
4. More than 200 employees dedicated to developing and improving power generator for various gas.
5. More than 1000 systems installed in over 20 countries using a variety of gases.
6. More than 50 people in the Customer Service Department making the Organization very Customer Responsive.

Municipal Waste Incineration Power Generation Plant for Sale
Municipal Waste Incineration Power Generation Plant for Sale

Municipal Waste Incineration Power Generation Plant for SaleFAQ
1.Are you a trading company or manufacture?
Manufacture with factory.
2.What kinds of gas generator set do you produce?
It covers for all kinds of gas produced in agriculture and industry, including biomass gas, biogas, natural gas, coal mine gas, coke oven gas, semi-coke gas and syngas, as well as related gas produce equipment.
3.What is your delivery time?
Normally within 60days, it depends on the configuration and quantity, please confirm with us before order.
4.What is your payment terms?
T/T or L/C.
5.How do you pack products?
Standard export packaging. Equipment packing with plastic bag, and with new solid wooden box, suitable for long-distance sea transportation, moisture-proof, earthquake, rust-proof and anti-brutal handling.
6.What is your available port of shipment?
Normally Qingdao port, other ports available according to customers' requirement.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier