• Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
  • Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
  • Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
  • Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
  • Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
  • Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

Certification: ISO, CE
Output Type: AC Three Phase
Standard: Nonstandard
Model: 300-1000GF
Rated Power: 300-1000kw
Fuel Type: Gas/ Coke Gas/ Syngas/Pyrolysis
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
300GF-2000GF
Speed
600rpm 1000rpm 1500rpm
Structure
Inline 4 Stroke
Type
Non-Turbocharger
Operation
on- Grid/ off-Grid
Warranty
One Year or 1500 Hours
Keywords
Generator Used for Land
Fuel
Wood Chip, Wood Dust Gas
Transport Package
Plywood Package by Seaway
Specification
300-1000kw
Trademark
zichai
Origin
Zibo, Shandong
HS Code
850220
Production Capacity
200

Product Description

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

Syngas-biomass generations are driven by low speed 300 series engines, the gas fuel can be generated from gasification of MSW, woodchips, sawdusts, rice husks, straws, coconut shells, coal gas, coking gas, coke oven gas and pyrolysis gas etc. Low Speed 300 engines are specially designed for syngas as fuel, with remarkable features of low speed, big cylinder, big displacement, naturally aspirated and strong resistance ability against the TAR, highly reliable, durable, the overhaul can reachover 60000 hours.
Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
Gas Quality Suggested
  • Gas temperature≤40ºC
  • Gas pressure 2.5~10kPa
  • Pressure change rate≤1kPa/min
  • Gas calorific value ≥ 4.0MJ/Nm3
  • Moisture content≤40g/Nm3, no free water
  • Impurity size≤5μm
  • Impurity content≤30mg/Nm3
  • Tar content≤50mg/Nm3
  • H2S≤50mg/Nm3
  • Total sulfur≤100mg/Nm3
  • NH3≤20mg/Nm3
  • C6H6≤50 mg/Nm3
  • C10H8≤50 mg/Nm3
  • H2≤60%
  • O2≤1%
Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
Gas Generator Specification
  Item Technical specification
Engine Model 6300D/M 6300D/M-1 8300D/M-2 8300D/M-3 9300D/M-1 9300ZLD/M
Type Inline, water cooled, four stroke, spark plug ignition
Non-turbocharged Turbocharged
Cylinder number 6 8 9
Cylinder diameter (mm) 300
Rated speed(r/min) 500 600 600 600 750 600
Rated power (kW) 330 440 550 660 880 1320
Rated thermal consumption(MJ/kW·h) ≤11.0
Rotate direction (From flywheel) Clockwise
Start mode Compressed air /motor start Compressed air start
Exhaust temperature (ºC) ≤600 ≤650
Oil consumption(g/kW·h) ≤0.8 ≤1.0
Generator set Type 300GFM 400GFM 500GFM 600GFM 800GFM 1200GFM
Rated power(kW) 300 400 500 600 800 1200
Frequency(HZ) 50
Voltage(V) 400/6300/10500
Current(A) 541/34/21 722/46/28 902/57/34 1083/69/41 1443/92/55 2165/137/82
Power factor (COSΦ) 0.8 (Lagging)
Phase and connecting 3phases 4wires /3phases 3wires
Dimension (L×W×H) (mm) 5800×1600×2900 6400×1600×2900 8500×1900×3500 8500×1900×3700
Weight(kg) 18000 22000 41000 42000

Customer Benefits for Syngas-Biomass Engines
• Cylinders Structure in Line & Upright & Concise Layout, which means simple, easy and low cost in operation & maintenance. Engine-Overhaul can be handled at user's site.
• Large cylinder (300mm), long stroke, low speed and big displacement 215L and 242L, which means big reserve power capacity and constant power output.
 Low engine speed at 500 or 600rpm, which means high reliability for continuous operation, sufficient combustion, low exhaust gas temperature and high heat efficiency.
• Naturally aspirated (no turbocharger and Intercooler), which means low failure rate and minimum downtime (TAR in syngas always block and damage turbocharger and intercooler).
• Internal mixing system (for high hydrogen gas over 15%), gas and air intake separately, then mixed in combustion room, which means no risk of backfire and cylinder knocking.
• Strong treatment and resistance ability against TAR, long term trouble free operation. TAR always raises problems of
pipeline-blocking, cylinder-pollution and spark plug-jamming etc.
 Compressed Air Starting System, smooth starting, high success rate and easy for maintenance.
• Open Cooling System, adopting plate-type heat exchanger, high efficiency and easy for scale-removal.
 Dismountable intake-valve-box, which means can clean TAR easily and conveniently (no need disassembling of cylinder head).
• Low-speed engine makes the noise lower. The maximum noise ≤100dB. Through silencer, the noise will be ≤70dB.
• Low speed means low components wearing, namely lower cost in spare parts replacement and long life span.
• Long Overhaul Time of 60,000 hours and lifecycle of 20-25 years, which ensure sustainable financial rewards of power plant.
  Applicable Gas Fuels
 
• Biomass from MSW, Woodchips, Sawdust, Straw, Rice husks, Nut-shells, and Chicken manure etc.
 
 Industrial tail gas & refinery gas, such as coal gas, coking gas, semi-coke gas, coke oven gas, oilshell tail gas, carbide tail gas, ferrochromium tail gas, yellow phosphorus tail gas, producer gas and paralysis gas etc.

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

 
6MW Woodchip Biomass Power Plant in Croatia
Waste to Energy project, 13x500kW syngas engines running in parallel, synchronized with utility. By using feedstocks of woodchips & rice husks, through biomass gasifier to produce combustible gas fuel, for cogeneration of electricity (for exporting energy) & hot steam (for drying feestocks) & byproducts of biochars, forming a comprehensive energy utilization system.
Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

Applications

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
 
Why Zichai Gas Generator Set?
1. Development and manufacturing internal combustion engine since 1970
2. Factory area over 330000m2 & over 2200 employees
3. Highly versatile power generator with ability to handle more than 20 different gases
4. More than 200 employees dedicated to developing and improving power generator for various gas.
5. More than 1000 systems installed in over 20 countries using a variety of gases.
6. More than 50 people in the Customer Service Department making the Organization very Customer Responsive.

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

Project References


Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
Our customers

Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass
Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass


Packing&Shipping
Rdf Power Plant Rdf Power Equipment Pyrolysis of Biomass

FAQ

1.Are you a trading company or manufacture?
Manufacture with factory.
2.What kinds of gas generator set do you produce?
It covers for all kinds of gas produced in agriculture and industry, including biomass gas, biogas, natural gas, coal mine gas, coke oven gas, semi-coke gas and syngas, as well as related gas produce equipment.
3.What is your delivery time?
Normally within 60days, it depends on the configuration and quantity, please confirm with us before order.
4.What is your payment terms?
T/T.
5.How do you pack products?
Standard export packaging. Equipment packing with plastic bag, and with new solid wooden box, suitable for long-distance sea transportation, moisture-proof, earthquake, rust-proof and anti-brutal handling.
6.What is your available port of shipment?
Normally Qingdao port, other ports available according to customers' requirement.

Send your message to this supplier

*From:
*To:
avatar Miss Gao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory
Type of Ownership
State-owned
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001